Skip to content
PlantDoctor
Menu

Paths and edging

Brick edging for beds and paths

One row, set firmly, slightly below the mower.

Cost
$80–300 / £60–250
Effort
Weekend
Aftercare
Low

Brick edging is older than most trends and still works. Set bricks on edge or flat, in a line you can mow against. A wobbly line looks drunk. Use a string. Dry-lay on a sand bed you have tamped, or mortar them if the path is formal. Do not set them high, or the mower bangs them and you still need a trimmer.

Plants that fit

Do it in this order

  1. String the line. Straight or a compass curve. Freehand wobbles.
  2. Dig a trench. Deep enough that the brick top is just under the grass.
  3. Tamp the base. Soft soil lets bricks sink one by one.
  4. Backfill and mow. The test is a mower pass, not a photograph.

Questions

How much does brick edging cost?

A realistic range for materials and plants is $80–300 / £60–250. Labor is extra if you hire it out.

How hard is it?

Weekend. The steps are ordered so the structure goes in before the plants.

How much work is it afterwards?

Maintenance is low. The overview says what that means for this idea, rather than a generic 'low care' claim.